国产伦子伦对白视频,91精品国产日韩91久久久久久,安微BBB桑BBB桑BBB,亚洲成人无码AV,亚洲成a人片7777777影片

Embossing machine

Metal slitting machine: metal slitting machine equipment is divided into three categories: simple metal slitting machine, hydraulic semi-automatic metal slitting machine, automatic metal slitting machine, metal slitting machine is mainly aimed at metal coil, such as strip steel, stainless steel, etc., slicing strip into several required specifications. Suitable for processing cold-rolled and hot-rolled carbon steel, silicon steel, tinplate, stainless steel and all kinds of metal coils after surface coating 2. Automation production process: This production line has basic functions of uncoiling, longitudinal shearing, tension, winding and so on. Its standard working equipment has uncoiling.

Metal slitting machine:

Metal slitting machine equipment is divided into three categories: simple metal slitting machine hydraulic semi-automatic metal slitting machine automatic metal slitting machine

Metal strip splitter is mainly aimed at metal coil, such as strip steel, stainless steel, etc. The strip is longitudinally cut into a number of required specifications strip. Suitable for processing cold-rolled and hot-rolled carbon steel, silicon steel, tinplate, stainless steel and coated metal coils

2, automated production process:

The production line has the basic functions of uncoiling, longitudinal shearing, tension and winding. Its standard working equipment consists of uncoiler, buffer pit, side guide position, longitudinal shearing machine and power, transition frame, waste edge reclaimer, back looper, tensioner, winding machine, hydraulic system, electrical system, etc. The production line is mainly composed of feeding trolley, uncoiler, leveler, longitudinal shear, waste edge winder, tensioner, winder and unloading device.

3. product features:

The  production line is controlled by PLC numerical control system. The  length is measured by encoder. Length, shear quantity and speed  information can be input into the PLC system, touch screen man-machine  settings, when the shear quantity is reached, the production line can  automatically stop. The speed of the production line can be adjusted. It  has high measuring accuracy, the whole line can work automatically, and  the operation is simple, and the sheet can be made.


4. Product parameters:

Model

metF500

met650

metF750

metF850

metF1100

metF1350

Working board width

460

620

720

820

950

1300

Working board width

0.1-2.0

0.1-2.0

0.1-2.0

0.1-2.0

0.2-2.5

02-2.5

Number of common bars

10-20

10-20

10-20

10-20

10-20

10-20

Rated total power

33

33

33

37

37-45

37-45

Splitting velocity

0-100

0-100

0-100

0-100

0-70

0-70

Weight of retractable coil

5

5

5

6

8.5

10

Space space

4X15

4X16

4X18

4X18

6X22

6X22

Working board width

460

620

720

820

950

1300



Operating procedures

1. Purpose:

1.1  in order to better ensure the normal operation of the equipment,  effective guarantee of smooth production, meet product requirements.

1.2 effective maintenance of equipment.

1.3 write reasonable operation instructions to ensure the production plan and product quality requirements are reached.

2, scope of use:

Welded pipe production: bar and row production

3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2  accurately control the operation of the machine before shift and  coordinate with normal production. Pay attention to the opening of  water, gas and electricity, and whether the equipment is normal.

4, boot:

4  before starting, according to the lubrication requirements, injecting  different lubricants to the parts where the lubricating oil is required  to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2  Check whether the mechanical parts and pneumatic system are normal or  not. If there are abnormal phenomena, they should be checked and  eliminated in time so as not to cause mechanical equipment accidents.

4.3  Check the transmission gear is correct, otherwise there will be quality  problems, whether the pressure gauge of the cutting machine reaches  0.5-0.7 mpa, otherwise it can not be cut.

4.4  Let the motor run empty for 2-3 minutes before going to work every  morning. The transmission gears are equal to 0. When driving, the  operator is not allowed to leave the machine tool and do other  irrelevant things.

4.5 it is  strictly prohibited to wear gloves to boot, long sleeved clothes must  wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8  during the operation, you are not allowed to leave the machine tool.  You are not allowed to do other irrelevant things, and pay attention to  whether the welds are normal.

4.9  In the process of pipe-making, the cutting strip must be consented by  the workshop director, stored in the belt-laying area, and recorded in  detail with the sling operator on the Production Process Card. It must  not be discarded at will.

4.10  If abnormal phenomena are found in operation, such as smoke, burning  odor, sudden fuse burning, sudden extinguishment of indicator lights and  timely switching off the power switch to be checked out, then turn on  operation after troubleshooting.

4.11  the width of the product is always checked by the front and side wires,  and strictly controlled between the 2 divisions. steel strip

5, downtime:

5.1 turn off the power while the motor stops.

5.2 clean the gauges carefully with clean cotton cloth, place them in the box and put them into the toolbox.

5.3 clean up all the fixtures and fixtures on the machine tools and classify them into the toolbox.

6, on-site finishing or handover.

6.1 clean the surrounding 1 meters of equipment within 20 minutes before each shift, including the corresponding window sill.

6.2 clean the floor and the bottom of the machine tool and wipe the whole equipment clean.

6.3 hoist the finished product to the designated location.

6.4  After work, the specifications and weights produced by oneself are well  registered on the production record card, and the quality inspection  statistics are made by the workshop, and the "Production Process Card"  is filled in to explain the operation of the machine and the matters  needing attention of the successors. Clean the machine and the regional  health before leaving.


人人妻人人澡人人爽人人 | 在线观看强奸美女视频网站大全 | 国产精品一级毛片久久久网爆门 | 欧美人黑A片无码免视费 | 国产熟妇婬乱A片免费看牛牛 | 嫩呦国产一区二区三区AV | 牛夜精品久久久久久久 | 四川丰满少妇被弄到高潮 | 成人千千网性爱一级A片视频 | 精品国产无码一区二区三区 | 91精品国产综合久久久久久漫画 | 干丝袜美女自慰高潮 | 亚洲中文字幕一区 | 免费黄色视频网站免费在线观看 | 在线观看永久免费麻豆 | 国产 成年妇 视频下载 | 国产精品久久久久久亚洲色欲 | 蜜桃mv在线mv免费mv香蕉 | 日韩蜜桃嫩草牛牛人妻无码 | 亚洲中文字幕在线视频 | 一级毛片生活黄色的 | 无码人妻精品一二三区免费 | 人人澡超碰碰97碰碰碰 | 国产精自产拍久久久久久蜜 | 台湾佬成人娱乐222XXXX | 特极西西444WWW大胆无码 | 国产v片在线观看 | 国产三级片网站在线观看 | 久久精品国产精品亚洲色婷婷 | 黄色视频无码在线观看 | 2022精品国偷自产免费观看 | AV蜜桃在线免费观看 | 蜜桃AV首页在线观看 | 国产乱码精品一区二区 | 久久久亚洲精品HD | 亲子乱婬一级A片 | 亚洲无码中文字幕在线 | 高潮丰满极品乱伦 | 午夜免费激情视频 | 影音先锋亚洲成av人在 | 17.c 蜜桃视频 红桃视频 |