国产伦子伦对白视频,91精品国产日韩91久久久久久,安微BBB桑BBB桑BBB,亚洲成人无码AV,亚洲成a人片7777777影片

In-line leveling machine

1. On-line internal weld leveling machine stainless steel in-line leveling (also known as internal weld leveling): stainless steel welding into steel pipe and other circular workpieces will appear uneven, uneven inside and outside the weld, leveling is the use of special internal weld leveling equipment in the weld pressure multi-pass rolling, and ultimately the welding leveling, so that The internal and external weld surface is smooth without stratification. It is suitable for oil, chemical, nuclear power, boilers, food, medicine and other industries instead of stainless steel seamless pipes. 2. Automated production process: internal leveling.

1. In-line weld leveling machine

Stainless steel on-line  internal leveling (also known as internal weld leveling): When stainless  steel is welded into circular workpieces such as steel pipes, there  will be unevenness and irregularity inside and outside the weld.  Leveling is to use special internal seam leveling equipment to pressure  multi-pass rolling on the weld, and eventually leveling the welding, so  that the surface of the internal and external welds will not appear  smoothly. Layered. It is suitable for oil, chemical, nuclear power,  boilers, food, medicine and other industries instead of stainless steel  seamless pipes.


2, automated production process:

The  internal leveling stainless steel machinery consists of internal and  external weld leveling stand, hydraulic pneumatic system, automatic  electro-hydraulic-pneumatic control system with PLC control, and also  includes die and rolling fluid circulation equipment. After rolling with  horizontal rollers, the residual height of stainless steel welded pipe  with internal and external weld seam is removed, the cross section of  welded pipe becomes a horizontal ellipse, and the mandrel is stuck in  the welded pipe to follow the welded pipe; after rolling with vertical  rollers, the cross section of welded pipe becomes a positive circle.  When the mandrel and welded pipe are separated from the frame, the  cylinder is pulled back to the appropriate position, and then the second  one is carried out. Rolling cycle


3, product characteristics:

The  internal and external welding seam leveling device of stainless steel  welded pipe is a reciprocating automatic rolling device with built-in  mandrel and roll for rolling stainless steel welded pipe. By controlling  the rolling strength and pass, the requirements of leveling the  internal and external welding seam, completely removing the excess  height of the internal and external welding seam and leveling with the  base metal can be achieved. Popularly speaking, it is to realize  seamless welding of stainless steel welded pipe.


4. Product parameters:

Model

pipe diameter

wall thickness

speed

power

metN40

O.D.1251mm

0.5-2.0mm

0-6m/min

7.5KW

metN 50

O.D.3276mm

0.5-3.0mm

0-6m/min

11KW

metN 60

O.D.50114mm

0.5-3.5mm

0-4m/min

11KW

metN 80

O.D.89168mm

0.5-4.0mm

0-3m/min

15KW

metN 100

O.D.100219mm

0.5-6.0mm

0-2m/min

15KW

metN 120

O.D.150273mm

0.5-8.0mm

0-1.5m/min

18.5KW

Operating procedures


1. Purpose:


1.1  in order to better ensure the normal operation of the equipment,  effective guarantee of smooth production, meet product requirements.


1.2 effective maintenance of equipment.


1.3 write reasonable operation instructions to ensure the production plan and product quality requirements are reached.


2, scope of use:


Welded pipe production: pipe making department.


3, rules:


3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.


3.2  accurately control the operation of the machine before shift and  coordinate with normal production. Pay attention to the opening of  water, gas and electricity, whether the grinding wheel, saw blade and  cutting table are normal.


4, boot:


4  before starting, according to the lubrication requirements, injecting  different lubricants to the parts where the lubricating oil is required  to be injected.


4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.


4.2  Check whether the mechanical parts and pneumatic system are normal or  not. If there are abnormal phenomena, they should be checked and  eliminated in time so as not to cause mechanical equipment accidents.


4.3  Check the transmission gear is correct, otherwise there will be quality  problems, whether the pressure gauge of the cutting machine reaches  0.5-0.7 mpa, otherwise it can not be cut.


4.4 Let the  motor run empty for 2-3 minutes before going to work every morning. The  transmission gears are equal to 0. When driving, the operator is not  allowed to leave the machine tool and do other irrelevant things.


4.5  it is strictly prohibited to wear gloves to boot, long sleeved clothes  must wear hand sleeves, and long hair must wear a hat.


4.6 do not wipe the rotating parts when starting.


4.7 correctly adjust the mold, not vigorously under pressure, in place.


4.8  during the operation, you are not allowed to leave the machine tool.  You are not allowed to do other irrelevant things, and pay attention to  whether the welds are normal.


4.9 In the process of  pipe-making, the cutting strip must be consented by the workshop  director, stored in the belt-laying area, and recorded in detail with  the sling operator on the Production Process Card. It must not be  discarded at will.


4.10 If abnormal phenomena are found  in operation, such as smoke, burning odor, sudden fuse burning, sudden  extinguishment of indicator lights and timely switching off the power  switch to be checked out, then turn on operation after troubleshooting.


4.11  the product's length is checked regularly, not more than 6.01 meters,  not less than 6 meters. Strictly controlled between 4mm. The pipe on the  unloading pipe rack should not exceed 95% of the total capacity, so  that the flat mouth personnel should be lifted in time, otherwise the  operator will be responsible for the damage.


5, downtime:


5.1 shut down the power while waiting for the welder to stop.


5.2 clean the gauges carefully with clean cotton cloth, place them in the box and put them into the toolbox.


5.3 clean up all the fixtures and fixtures on the machine tools and classify them into the toolbox.


6, on-site finishing or handover.


6.1 clean the surrounding 1 meters of equipment within 20 minutes before each shift, including the corresponding window sill.


6.2 clean the floor and the bottom of the machine tool and wipe the whole equipment clean.

6.3 pull the scrap stainless steel pipe out of the designated location.


6.4  At the end of work, the specifications and the number of branches  produced by oneself, the number of perforated pipes (branches) and the  waste (kg) are well registered on the production record card, and the  statistics are made by the workshop quality inspection, and the  "Production Process Card" is filled in, so that the operation of the  machine platform of successors and matters needing attention are handed  over. Clean the machine and the regional health before leaving.


91狠狠综合久久久久久 | 亚洲精品无码乱码成人果冻传媒 | 亚洲熟伦熟女新五十路熟妇 | 国产精品成人免费一区久久羞羞 | 午夜福利在线播放 | 亚洲熟妇色 二依 | 成人午夜免费电影 | 欧美母乳喷射观看在线 | 性生活国产精品久久 | 国产精品激烈高潮白浆 | 亚洲天堂AV免费在线观看 | 国产精品一区三区四区A片 欧美肥婆日逼视频免费播放 | 中国女人的j 视频 污 | 丝袜美腿精品无码AV蜜桃 | 又大又粗又爽又黑的网站 | 久久国产色Av免费观看暖暖 | 免费黄污高清无码网站 | 一区二区三区在线观看国产免费高清 | 性饥渴的人妻一级A片在线按摩 | 亚洲国产成人PORN | 欧美理伦一二三免费看 | 国产乱码精品一品二品 | 白白嫩嫩裸体美女A片 | 伊人色干综合在线视频 | 寡妇2高潮一级毛片 | 国产熟妇一区二区三区AⅤ网站 | 亚洲熟妇AV一区二区三区软件 | 粉嫩AV一区二区夜夜嗨 | 搡老女人51妇女老熟女 | 天天影视色欲综合插插插 | 91无码人妻一区二区 | 色偷偷一区二区三区 | 人禽交欧美网站婷婷基地五月天 | 91 国产丝袜在线放 | 91在线无码精品秘 国产阿朱 | 国产一区二区三区的情色影视 | 黄色视频国产的中文 | 国产伦子伦视频在线观看 | 91在线无码精品秘 入口在线 | 国产美女永久免费无遮挡 | 久久久久久久亚洲视频 |