国产伦子伦对白视频,91精品国产日韩91久久久久久,安微BBB桑BBB桑BBB,亚洲成人无码AV,亚洲成a人片7777777影片

Stainless steel pipe making machine stainless steel pipe welding machine

Productrealmap:Productdetails1.StainlesssteeldecorativepipecontrolmachineThestainlesssteeldecorativepipemachineismainlyusedfortheproductionofstainlesssteelpipesandcarbonsteelpipesfordecoration,product

Product real map:


1869497355_753290084.jpg


Product details

1. Stainless steel decorative pipe control machine

The stainless steel decorative pipe machine is mainly used for the production of stainless steel pipes and carbon steel pipes for decoration, products, household appliances, etc. The products produced by this series of moulds are round, square and rectangular pipes, as well as elliptical, semi-circular and plum-blossom pipes. Such as: stainless steel staircase handrails, burglar proof doors and windows, electric heating pipes, housing leakage pipes, etc.


2, automated production process:

Through the continuous forming process of uncoiling, feeding guidance, marking, forming, welding, external weld grinding, shaping and sizing, sizing, cutting (coil), jointing, etc., the structure is fine and the operation is simple.


3. Product characteristics: the machine is strong, durable, high precision, fully automated, simple to operate, continuous production, high efficiency, less waste of materials, high yield, low production cost.


4, technical parameters:

Model

(mm)

(mm)

(mm) 

(mm) 

Power

L*W(m) 

Basic specification for pipe making machine

met-30

 30

 20

Φ5-Φ25

 0.25-0.8

 5.5KW

 19.5*1.0m

met-S40

 40

 25

Φ6-Φ40

 0.25-1.2

 5.5KW

 20*1.0m

met-40

 40

 25

Φ9.5-Φ50.8

 0.25-2.0

 7.5KW

 21.5*1.1m

met-40L

 40

 25

Φ12.7-Φ63.5

 0.25-2.0

 11KW

 21.5*1.1m

met-50 

 50

 30

Φ25.4-Φ76.2

 0.4-2.5

 15KW

 24*1.2m

met-60

 60

 40

Φ50.8-Φ114

 0.7-3.0

 18.5KW

 26*1.4m

met-80

 80

 50

Φ76-Φ168

 1.0-4.0

 36.5KW

 32*2.3m

met-100

 100

 70

Φ114-Φ219

 1.5-4.5

 45KW

 36*2.5m

Operational considerations:

1, ensure smooth production and meet product requirements.

1.2 effective maintenance of equipment.

1.3, write reasonable operation instruction procedures to ensure the production plan and product quality achieve the desired goals.

2, scope of use:

Workshop management department.

3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2 accurately control the operation of the machine before shift and coordinate with normal production. Pay attention to the opening of water, gas or electricity, grinding the wheel, saw blade and cutting table.

4, boot:

4 before starting, according to the lubrication requirements, injecting different lubricants to the parts where the lubricating oil is required to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2 Check whether the mechanical parts and pneumatic system are normal or not. If there are abnormal phenomena, they should be checked and eliminated in time so as not to cause mechanical equipment accidents.

4.3 Check the transmission gear is correct, otherwise there will be quality problems, whether the pressure gauge of the cutting machine reaches 0.5-0.7 mpa, otherwise it can not be cut.

4.4 Let the motor run empty for 2-3 minutes before going to work every morning. The transmission gears are equal to 0. When driving, the operator is not allowed to leave the machine tool and do other irrelevant things.

4.5 it is strictly prohibited to wear gloves to boot, long sleeved clothes must wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8 during the operation, you are not allowed to leave the machine tool. You are not allowed to do other irrelevant things, and pay attention to whether the welds are normal.

4.9 In the process of pipe-making, the cutting strip must be consented by the workshop director, stored in the belt-laying area, and recorded in detail with the sling operator on the Production Process Card. It must not be discarded at will.

4.10 If abnormal phenomena are found in operation, such as smoke, burning odor, sudden fuse burning, sudden extinguishment of indicator lights and timely switching off the power switch to be checked out, then turn on operation after troubleshooting.

4.11 the product's length is checked regularly, not more than 6.01 meters, not less than 6 meters. Strictly controlled between 4mm. The pipe on the unloading pipe rack should not exceed 95% of the total capacity, so that the flat mouth personnel should be lifted in time, otherwise the operator will be responsible for the damage.

5, downtime:

5.1 stop welding while closing the power supply.

3

4

5

6


精品人妻一区二区三区四区 | 少妇被黑人到高潮喷白浆 | 精品人妻AV有码一区二区 | 特一级一性一交一视一频 | 无码人妻精品一区二区蜜桃网站文 | 寡妇高潮一级毛片免费看小说 | 国产又大又粗又黄的视频 | 人妻丰满熟妇av无码久久洗澡 | 亚洲色婷婷国产精品杨思敏 | 精品国产高清在线观看 | 丰滿岳乱妇一区二区... | 韩国无码成人片在线观看 | 古典武侠,人妻,狠狠,久久 | 丰满人妻熟女aⅴ中文字幕 eeuss鲁丝片aⅴ无码 | 一级做a爰片久久久杨思敏 一级婬片A片试看45分钟 | 国产精品JIZZ在线观看无码 | 少好搡BBB搡BBBB | 近親相姦親子中出中文字幕 | 天天日天天射天天干 | 国产伦精一区二区三赶尸艳谈 | 中文字幕一区两区 | 亚洲欧洲AV无码区玉蒲区 | 亚洲国产成人精品无码区2022 | Free性丰满69性欧美 | 亚洲人成电影一区二区在线 | 强辱丰满人妻HD中文字幕 | 国产精品成人A片在线果冻 3d动漫精品啪啪一区二区 | 日本一区不卡在线观看 | 99久久久无码国广精品 | 成人免费网站www污污污 | 国产成人一区二区三区 | 调教我的妺妺H肉yin荡视频 | 精品国产18久久久久久 | 欧美不卡一区二区三区 | 可以免费观看的黄色视频网站 | 国产裸体美女永久免费无遮拦 | 国产乱码精品一区二区三区亚洲人 | 在线观看免费毛片高清视频 | 日韩成人在线免费观看 | 国精品一区二区三区在线 | 女生喷水视频在线观看 |