国产伦子伦对白视频,91精品国产日韩91久久久久久,安微BBB桑BBB桑BBB,亚洲成人无码AV,亚洲成a人片7777777影片

Stainless steel pipe making machine stainless steel pipe welding machine

Productrealmap:Productdetails1.StainlesssteeldecorativepipecontrolmachineThestainlesssteeldecorativepipemachineismainlyusedfortheproductionofstainlesssteelpipesandcarbonsteelpipesfordecoration,product

Product real map:


1869497355_753290084.jpg


Product details

1. Stainless steel decorative pipe control machine

The stainless steel decorative pipe machine is mainly used for the production of stainless steel pipes and carbon steel pipes for decoration, products, household appliances, etc. The products produced by this series of moulds are round, square and rectangular pipes, as well as elliptical, semi-circular and plum-blossom pipes. Such as: stainless steel staircase handrails, burglar proof doors and windows, electric heating pipes, housing leakage pipes, etc.


2, automated production process:

Through the continuous forming process of uncoiling, feeding guidance, marking, forming, welding, external weld grinding, shaping and sizing, sizing, cutting (coil), jointing, etc., the structure is fine and the operation is simple.


3. Product characteristics: the machine is strong, durable, high precision, fully automated, simple to operate, continuous production, high efficiency, less waste of materials, high yield, low production cost.


4, technical parameters:

Model

(mm)

(mm)

(mm) 

(mm) 

Power

L*W(m) 

Basic specification for pipe making machine

met-30

 30

 20

Φ5-Φ25

 0.25-0.8

 5.5KW

 19.5*1.0m

met-S40

 40

 25

Φ6-Φ40

 0.25-1.2

 5.5KW

 20*1.0m

met-40

 40

 25

Φ9.5-Φ50.8

 0.25-2.0

 7.5KW

 21.5*1.1m

met-40L

 40

 25

Φ12.7-Φ63.5

 0.25-2.0

 11KW

 21.5*1.1m

met-50 

 50

 30

Φ25.4-Φ76.2

 0.4-2.5

 15KW

 24*1.2m

met-60

 60

 40

Φ50.8-Φ114

 0.7-3.0

 18.5KW

 26*1.4m

met-80

 80

 50

Φ76-Φ168

 1.0-4.0

 36.5KW

 32*2.3m

met-100

 100

 70

Φ114-Φ219

 1.5-4.5

 45KW

 36*2.5m

Operational considerations:

1, ensure smooth production and meet product requirements.

1.2 effective maintenance of equipment.

1.3, write reasonable operation instruction procedures to ensure the production plan and product quality achieve the desired goals.

2, scope of use:

Workshop management department.

3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2 accurately control the operation of the machine before shift and coordinate with normal production. Pay attention to the opening of water, gas or electricity, grinding the wheel, saw blade and cutting table.

4, boot:

4 before starting, according to the lubrication requirements, injecting different lubricants to the parts where the lubricating oil is required to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2 Check whether the mechanical parts and pneumatic system are normal or not. If there are abnormal phenomena, they should be checked and eliminated in time so as not to cause mechanical equipment accidents.

4.3 Check the transmission gear is correct, otherwise there will be quality problems, whether the pressure gauge of the cutting machine reaches 0.5-0.7 mpa, otherwise it can not be cut.

4.4 Let the motor run empty for 2-3 minutes before going to work every morning. The transmission gears are equal to 0. When driving, the operator is not allowed to leave the machine tool and do other irrelevant things.

4.5 it is strictly prohibited to wear gloves to boot, long sleeved clothes must wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8 during the operation, you are not allowed to leave the machine tool. You are not allowed to do other irrelevant things, and pay attention to whether the welds are normal.

4.9 In the process of pipe-making, the cutting strip must be consented by the workshop director, stored in the belt-laying area, and recorded in detail with the sling operator on the Production Process Card. It must not be discarded at will.

4.10 If abnormal phenomena are found in operation, such as smoke, burning odor, sudden fuse burning, sudden extinguishment of indicator lights and timely switching off the power switch to be checked out, then turn on operation after troubleshooting.

4.11 the product's length is checked regularly, not more than 6.01 meters, not less than 6 meters. Strictly controlled between 4mm. The pipe on the unloading pipe rack should not exceed 95% of the total capacity, so that the flat mouth personnel should be lifted in time, otherwise the operator will be responsible for the damage.

5, downtime:

5.1 stop welding while closing the power supply.

3

4

5

6


国产亲子乱婬一级A片 | 亚州成人av一区二区三区 | 免费四川农村A片特黄 | 中文字幕乱码AV在线 | 国产无码在线高清视频 | 精品国产乱码久久久久久郑州公司 | 欧美性猛久久久久久久 | 午夜视频在线观看视频91 | 麻豆亚洲AV成人无码一区精品 | 放荡寡妇欧美一级A片 | 国产,日韩,欧美 | 稚嫩A∨一区二区三区 | 无码人妻AⅤ一区二区三区鲁大师 | 黄片一区二区三区四区五区六区七区 | 強暴人妻HD中文字幕 | 精品国产18久久久久久 | 在线观看黄色视频免费 | 无套内谢少妇毛片教师 | 国产欧美综合 激情 | 两个人爽爽视频免费观看 | 国产精品白丝jk喷白浆软件 | 潮喷无码视频在线观看 | 黄色视频AAA级毛片 欧美必出精品在线观看 | 波多野50部无码喷潮 | 欧美黑人受性ⅩXXX A片视频免费在线播放 | 国产午夜精品理论片A级探花 | 国产老熟女伦老熟妇精品 | 国产欧美日韩综合精品一区二区 | 成人av在线观看一区二区 | 精品一级毛片A久久久久 | 精品动漫中文子幕三区 | 丰满人妻熟女中文字幕AⅤ 一级做a爰片久久免费观看 | 人与禽一级婬片A片老牛 | 久久人人国精品蜜桃 | 久久久成人免费视频 | 国产精品久久久久久久一区探花 | 搡老女人老妇人一级A片 | 久久夜色撩人精品国产小说 | 精品少妇做爰无码无码 | 又黑又粗又大又硬视频 | 久久久久久久久成人精品视频 |