国产伦子伦对白视频,91精品国产日韩91久久久久久,安微BBB桑BBB桑BBB,亚洲成人无码AV,亚洲成a人片7777777影片

stainless steel pipe welding machine

Productrealmap:ProductDetails1.StainlesssteeldecorativepipecontrolmachineThestainlesssteeldecorativepipemachineismainlyusedfortheproductionofstainlesssteelpipesandcarbonsteelpipesfordecoration,product

Product real map:


1869497355_753290084

 


Product Details


1. Stainless steel decorative pipe control machine

The stainless steel decorative pipe machine is mainly used for the production of stainless steel pipes and carbon steel pipes for decoration, products, household appliances, etc. The products produced by this series of moulds are round, square and rectangular pipes, as well as elliptical, semi-circular and plum-blossom pipes. Such as: stainless steel staircase handrails, burglar proof doors and windows, electric heating pipes, housing leakage pipes, etc.


2, automated production process:

Through the continuous forming process of uncoiling, feeding guidance, marking, forming, welding, external weld grinding, shaping and sizing, sizing, cutting (coil), jointing, etc., the structure is fine and the operation is simple.


3. Product characteristics: the machine is strong, durable, high precision, fully automated, simple to operate, continuous production, high efficiency, less waste of materials, high yield, low production cost.


4, technical parameters:


Model

Horizontal(mm)

Vertical(mm)

(mm) 

(mm) 

power

sizeL*W(m) 

Specification for decorative pipe control machine

met-30

 30

 20

Φ5-Φ25

 0.25-0.8

 5.5KW

 19.5*1.0m

met-S40

 40

 25

Φ6-Φ40

 0.25-1.2

 5.5KW

 20*1.0m

met-40

 40

 25

Φ9.5-Φ50.8

 0.25-2.0

 7.5KW

 21.5*1.1m

met-40L

 40

 25

Φ12.7-Φ63.5

 0.25-2.0

 11KW

 21.5*1.1m

met-50 

 50

 30

Φ25.4-Φ76.2

 0.4-2.5

 15KW

 24*1.2m

met-60

 60

 40

Φ50.8-Φ114

 0.7-3.0

 18.5KW

 26*1.4m

met-80

 80

 50

Φ76-Φ168

 1.0-4.0

 36.5KW

 32*2.3m

met-100

 100

 70

Φ114-Φ219

 1.5-4.5

 45KW

 36*2.5m



Operational considerations:


1, ensure smooth production and meet product requirements.


1.2 effective maintenance of equipment.


1.3, write reasonable operation instruction procedures to ensure the production plan and product quality achieve the desired goals.


2, scope of use:

Workshop management department.


3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2 accurately control the operation of the machine before shift and coordinate with normal production. Pay attention to the opening of water, gas or electricity, grinding the wheel, saw blade and cutting table.

4, boot:

4 before starting, according to the lubrication requirements, injecting different lubricants to the parts where the lubricating oil is required to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2 Check whether the mechanical parts and pneumatic system are normal or not. If there are abnormal phenomena, they should be checked and eliminated in time so as not to cause mechanical equipment accidents.

4.3 Check the transmission gear is correct, otherwise there will be quality problems, whether the pressure gauge of the cutting machine reaches 0.5-0.7 mpa, otherwise it can not be cut.

4.4 Let the motor run empty for 2-3 minutes before going to work every morning. The transmission gears are equal to 0. When driving, the operator is not allowed to leave the machine tool and do other irrelevant things.

4.5 it is strictly prohibited to wear gloves to boot, long sleeved clothes must wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8 during the operation, you are not allowed to leave the machine tool. You are not allowed to do other irrelevant things, and pay attention to whether the welds are normal.

4.9 In the process of pipe-making, the cutting strip must be consented by the workshop director, stored in the belt-laying area, and recorded in detail with the sling operator on the Production Process Card. It must not be discarded at will.

4.10 If abnormal phenomena are found in operation, such as smoke, burning odor, sudden fuse burning, sudden extinguishment of indicator lights and timely switching off the power switch to be checked out, then turn on operation after troubleshooting.

4.11 the product's length is checked regularly, not more than 6.01 meters, not less than 6 meters. Strictly controlled between 4mm. The pipe on the unloading pipe rack should not exceed 95% of the total capacity, so that the flat mouth personnel should be lifted in time, otherwise the operator will be responsible for the damage.

5, downtime:

5.1 stop welding while closing the power supply.


欧美白人乱大交XXXX潮喷 | 老牛啪啪12区视频 | 影音先锋AV资源网站 | 亚洲av无码乱码国产精品 | 免费看一区二区三区裸体 | 性XXXⅩ m免费 | 国产精品人妻无码18 | 成人做爰黄A片免费看内衣 69国产精品成人无码视频 | 西西大胆人体视频 | 国产91 在线播放九色竹菊影视 | 精品人妻二区三区蜜桃 | 国产又粗又长又白又大 | 日本一本二本三本免费观看 | 亚洲精品一区二区三区闺蜜 | 脫衣舞一区二区三区 | 色欲人妻AAAAADIY101 | 久久午夜夜伦鲁鲁片无码免费 | 成人小视频在线观看内射 | !欧美午夜在线看视频 | 91精品国产乱码久久久久久 | 久久播瑟瑟爱人妻熟女 | 天天操天天射天天综合 | 中文字幕二区人妻一区有码 | 精品在线免费视频 | 在线免费观看黄色视频网站 | 国产又粗又猛又爽 | 国产人妻人伦精品九色 | 日韩精品偷窥自拍 | 天天干天天干天天插天天爽 | 欧美喷潮喷水失禁合集 | 国产日韩av高清无码 | V一区无码内射国产 | 北示熟妇搡BB搡BB | 精品无码秘 人妻一区二蜜桃 | 国产口爆吞精一区二区 | 精品国产人妻AV多野结衣 | 国产一级婬片A片鲁大师 | 亚洲精品久久久无码大乳老师 | 91大神一区二区三区日韩 | 中文字幕一区二区三区乱码图片 | 国产精品久久久久久久 |